description Tideway Tunnel Overview
help Tideway Tunnel FAQ
What is the Tideway Tunnel, and why is it called the 'Super Sewer'?
The Tideway Tunnel is a major deep-level sewer tunnel running beneath the River Thames in London, designed to capture combined sewer overflows that currently discharge untreated storm-sewage into the river. It is widely called the 'Super Sewer' because of its massive diameter—around 7 meters—and its roughly 25-kilometer length.
When will the Tideway Tunnel be finished and operational?
Construction has been underway for several years, with main tunneling completed in the early 2020s and full commissioning expected around 2025. Once operational, it will transfer intercepted overflow to treatment works operated by Thames Water rather than releasing it into the Thames.
Why does London need the Tideway Tunnel, and what problem does it solve?
London's existing Victorian-era sewer system, originally designed by Joseph Bazalgette, combines storm water and sewage in the same pipes and overflows into the Thames during heavy rain. The Tideway Tunnel is designed to intercept tens of millions of tonnes of these combined sewer overflows each year.
Who owns and is building the Tideway Tunnel?
The project is being delivered by Tideway, an infrastructure company set up specifically for the project, with construction undertaken by major joint ventures including companies such as Bam Nuttall, Ferrovial, and Laing O'Rourke. Thames Water will operate the tunnel once it is commissioned.
explore Explore More
Similar to Tideway Tunnel
See all arrow_forwardReviews & Comments
Write a Review
Be the first to review
Share your thoughts with the community and help others make better decisions.